Panther Lake
AI overview
Sign in and the AI will write an overview from our coverage.
Headlines · 2
- Intel shifts Oregon 18A capacity to Intel 3 for Xeon 6 servers
Intel said it will convert part of its Oregon Intel 18A resources to the Intel 3 process, which is used for Xeon 6 “Granite Rapids” server processors, according to cnBeta and IT之家. The company expects the added Oregon capacity to enter mass production in the second half of 2027, while IT之家 also reported expansion at Fab 24 and Fab 62 and additional advanced-packaging capacity. Intel attributed the reallocation partly to weaker PC demand and stronger server demand linked to AI infrastructure.
cnBeta · 🔥 15 - Intel confirms Razor Lake-AX for 2028 with 700 TOPS for physical AI
Intel SVP Cho Min-sung said at the "Semiconductors Powering Humanoids" seminar in Seoul's Samseong-dong that Intel plans to bring its next-generation Nova Lake processor to physical AI in early 2027, followed by Razor Lake-AX in 2028 with a platform AI compute target of 700 TOPS. Reports put that at roughly 3.88x the 180 TOPS of current Panther Lake (Core Series 3) chips and about 2.5x Nvidia's Jetson AGX Orin at 275 TOPS. Based on prior leaks, Razor Lake-AX is described not as a traditional PC platform but as an integrated high-performance design akin to AMD's Ryzen Halo, keeping Nova Lake's core layout while adding 16 or 32 Xe3P cores, a large unified memory pool and possibly on-package memory, aimed at robots and other premium physical-AI devices.
IT之家 AI · 🔥 0
Experience and discussion from the community
Share my Panther Lake experienceAsk about Panther Lake
Nobody has shared their experience with Panther Lake yet.