Nvidia and PreussenElektra assess nuclear sites for AI data centers
PreussenElektra and Nvidia have begun assessing whether decommissioned German nuclear-plant sites can support high-performance AI data centers. PreussenElektra will provide site and infrastructure information, while Nvidia will evaluate technical requirements and possible layouts, including grid connections, available land and industrial systems. TechNews and Tom’s Hardware report that this remains an open-ended feasibility study with no construction agreement, selected site or investment amount, and that it does not involve using nuclear generation to power the facilities.
The assessment, described by TechNews and Tom’s Hardware, is a notable brownfield strategy for expanding AI infrastructure, but claims that existing sites can reduce development costs or timelines remain unverified until technical, economic, energy and regulatory reviews are completed.
- Nvidia wants to turn Germany's retired nuclear sites into AI data centers
- Germany's nuclear shutdown leaves dozens of former power stations awaiting dismantling
- Nvidia and PreussenElektra are investigating new uses for Germany's retired nuclear facilities
Nvidia has agreed to examine whether shuttered German reactor sites could become computing hubs, though the company rules out restarting any idle units.
The US chipmaker signed a preliminary agreement with PreussenElektra GmbH (PEL), a utility from Germany, to study the idea at decommissioned locations.
The arrangement does not involve generating electricity from fission for any future facility, since the work concentrates on existing grid links and water access.
Reusing sites without reviving reactors
Following the Fukushima incident, Germany permanently closed its final operating reactors in April 2023 and is now dismantling about 30 atomic stations nationwide.